Imperial Linemarking is based in Brisbane and serves sites across the city — CBD and inner-city basements, the northside and southside retail centres, the school and medical car parks in between, and the industrial estates out through Australia TradeCoast and Acacia Ridge. Car parks, warehouse floors, private roads and estate work, set out to the standards your site is assessed against.
Faded bays cost more than looks. A worn car park loses usable spaces, muddles traffic flow and puts you on the wrong side of an insurer or a certifier when something goes wrong in it. Fresh markings can improve the clarity of the layout. We assess the existing set-out and discuss any concerns before repainting.
Who calls us in Brisbane
Body corporate and strata managers with basement car parks in Fortitude Valley, West End and Toowong. Retail and medical centre managers on the northside and southside. Builders finishing new-build car parks that need marking before handover. Warehouse and distribution operators through Eagle Farm, Acacia Ridge, Rocklea, Geebung and the Australia TradeCoast.
Basements and multi-level car parks
Low-clearance basements are their own job — tight columns, poor light, no room for a big machine to run a long straight line, and no chance of natural drying. These get marked with quick-drying product, staged level by level, and usually out of hours so residents keep access to at least half the parking.
Working around a trading site
Most Brisbane car parks cannot close. Jobs get staged in sections, or run at night from about 8pm, so bays are back in service before the morning rush. Cones, tape and a traffic control plan are supplied where the site needs them. Recent work from around South East Queensland is in the gallery, and wheel stops and bay signage can be supplied on the same visit.
Warehouses and industrial estates
Concrete floors and hardstand yards through Eagle Farm, Pinkenba, Northgate, Geebung, Rocklea, Acacia Ridge and Archerfield — forklift lanes, pedestrian walkways, racking and pallet bay outlines, keep-clear zones at switchboards and exits, and hazard hatching that stands up to an audit. Epoxy and two-pack where standard paint would not last the year.
New builds and handover marking
Marking taken straight off the civil or architectural drawings for builders finishing a car park before handover, including accessible bays, shared areas, bollard and sign positions. Anything in the drawn layout that will not comply on the ground gets flagged at quote stage.
Schools, clubs and community sites
Drop-off and kiss-and-go zones, staff and visitor parking, court markings and play-area games, booked for weekends or school holidays so there is no interruption to the site.